Wednesday, June 17, 2009

Pool Project Day 1


Day 1 was pretty uneventful. The pool got drained and you can see the crater with no water. I walked around the bottom of my empty pool and I felt about 7 more areas that would turn into the same type of crater as this one. One felt much bigger than this one (this one was about 16" long and 12" wide). I was able to work outside all day long pulling weeds and cleaning up my garden.

No comments: